-
What are the core differences between different grades of sodium butyrate (feed grade/ pharmaceutical grade/ food grade)?2025-06-27 08:59:35
The main differences lie in purity, impurity control, and functional verification. For example, pharmaceutical grade requires a purity of ≥99% and sterility, while feed grade needs to verify intestinal repair rate.
-
In which fields are citrates most widely used?2025-06-27 09:04:05
Food and beverage (preservative), medicine (pH regulator), industrial cleaning (chelating agent), and cosmetics (stabilizer).
-
What regulations should be noted when exporting chemical products to the EU?2025-06-27 09:10:25
It is necessary to comply with the REACH regulation (registration is required for annual tonnage ≥1 ton), and additional notification is required if the concentration of SVHC substances exceeds 0.1%.
-
How does U.S. export control determine if a product is subject to EAR?2025-07-09 09:56:22
It is subject to jurisdiction if it meets the territorial rules (transited through the U.S.) or origin rules (U.S. content ≥10%), etc.
-
What are the main export markets for chemical products?2025-07-09 10:00:02
Europe (Belgium, Germany), the Americas (United States, Brazil), Asia (Japan, India) and the Middle East (Saudi Arabia).
-
How to meet certification requirements in emerging markets?2025-07-09 10:03:09
For example, South Korea's K-REACH requires registration through a local representative; annual tonnage ≥1 ton requires declaration of use and safety data.
-
Can customized products meeting specific national standards be provided?2025-07-09 10:05:47
Support for adjusting formulas and documents according to target country standards (e.g., EU EC 1333/2008, US FDA GRAS).
-
How to ensure product quality is consistent with samples?2025-07-09 10:10:08
We implement three guarantees: ① Batch sample comparison (retain customer-confirmed samples and bulk product samples) ② Third-party testing reports (e.g., SGS purity testing) ③ Acceptance of re-inspection upon delivery (return or exchange available if deviation exceeds ±0.5%).
-
How to handle product quality disputes?2025-07-09 10:13:22
The standard process is: Provide dispute evidence → Re-inspection by both parties' laboratories → Accept CIQ arbitration → Compensation according to contract terms (usually replenishment or refund).
-
Do new customers have to pay in full before shipment?2025-07-09 10:21:26
For the first order, 30% advance payment + 70% payment against copy of bill of lading is recommended. After 3 cooperations, L/C payment can be applied (subject to bank credit review).
-
Who bears the losses caused by exchange rate fluctuations?2025-07-09 10:26:42
By default, the contract locks the exchange rate at the Bank of China's spot exchange buying rate on the order date. Cross-border RMB settlement can also be chosen to avoid risks.
-
What if sea freight delays cause a missed production cycle?2025-07-09 10:29:59
Emergency plans are provided: ① Priority recommendation of China-Europe Railway Express (40% faster than sea freight) ② Urgent orders can be split for air freight (freight difference to be supplemented).
-
What fees are incurred due to customs clearance delays at the destination port?2025-07-09 10:35:03
Demurrage/container detention fees are calculated daily (usually USD 100-300/day). It is recommended to purchase DDP terms, where we handle customs clearance.
-
Can on-site guidance be provided for technical issues?2025-07-09 10:38:39
48-hour response in Asia; remote video diagnosis provided in Europe and America (requires advance engineer appointment).
-
How to handle situations where export is impossible due to policy changes?2025-07-09 10:42:54
Cite the "force majeure clause" in the contract: refund the paid amount or store the goods temporarily until policies are relaxed (we bear the storage fees).
-
Who is responsible if the customer fails to provide the import license in time?2025-07-09 10:46:47
A "Document Timeliness Commitment" must be signed upon order confirmation; failure to provide it within the deadline will be deemed as automatic abandonment of the goods.